| 1 |
Search Results |
 |
91st Ave WWTP Unified Plant Expansion 2005 - Project A Project No. WS90100079 (WS90100057)
| Location: |
Tolleson, AZ |
| Description: |
Transmit effluent water to the Tres Rios Wetlands project and to the ANPP Transmission line. |
| Built By: |
PCL Construction, Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Ben Sawyer Swing Bridge Design-Build
| Location: |
Charleston, SC |
| Description: |
Superstructure replacement of the Ben Sawyer Swing Bridge |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Hart Bridge over St. Johns River on SR-228 (Bridge No. 720107)
| Location: |
Jacksonville, FL |
| Description: |
Structural Steel Repair and Bridge Painting |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
I-275(SR-93) Himes Ave. to Hillsborough River
| Location: |
Tampa, FL |
| Description: |
Interstate Widening |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Johnny G. Martinez Water Quality Improvement Project GMP 3 - Project No. 3201091
| Location: |
Tempe, AZ |
| Description: |
Installation of 3 new Gravity Plate Settlers and associated pump station piping. |
| Built By: |
PCL Construction, Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Jordan Basin Water Reclamation Facility
| Location: |
Riverton, UT |
| Description: |
Construction of a new 15 MGD membrane bioreactor WRF |
| Built By: |
PCL / Alder Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Pearl Harbor Memorial (Q) Bridge (I-95 New Haven)
| Location: |
New Haven, CT |
| Description: |
Construct extradosed cable-stayed bridge over the Quinnipac River |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
South Bay International Wastewater Treatment Plant, Secondary Treatment; International Boundary and Water Commission Contract No. IBM09C0004/Solicitation No. IBM08Q0005
| Location: |
San Diego, CA |
| Description: |
25 MGD Secondary Treatment Process |
| Built By: |
PCL Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
SPA 2 Regional WRF Phase 1 - 2 MGD
| Location: |
Surprise, AZ |
| Description: |
Construction of 2MGD Regional WRF |
| Built By: |
PCL Construction, Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
SR-408 (East-West Expressway) Widening from Crystal Lake to Conway
| Location: |
Orlando, FL |
| Description: |
Roadway and Bridge Widening |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Tesla Treatment Facility
| Location: |
Tracy, Californa , CA |
| Description: |
A new 315-mgd treatment facility. |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Tolleson WWTP Solids Handling Facilities Improvements
| Location: |
Tolleson, AZ |
| Description: |
Gerneral upgrades to solids handling facility. |
| Built By: |
PCL Construction, Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Town of Buckeye WWTP 1.5 MGD Expansion (D-B)
| Location: |
Buckeye, AZ |
| Description: |
Design/Build 1.5 MGD WWTP Expansion |
| Built By: |
PCL Construction, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Victoria Barge Canal Lift Bridge
| Location: |
TX |
| Description: |
Repairs to steel truss railroad lift bridge. |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
| |
| 1 |