|
|
|
|
|||||||||||||||||||||||
Project Description
This project involved the complete removal of the northbound and southbound two-lane, 11-span, 110-meter (360 feet) bridges across the Tomoka River in Ormond Beach, Florida. The replacement bridges utilized seven-span AASHTO Type II beams with a total span length of 107 meters at a slightly higher grade profile. The roadway reconstruction was approximately 540 meters (1770 feet) long for both northbound and southbound roadways.
|
Contact
For similar projects contact:OwnerFlorida Department of Transportation-Central Office
Prime ConsultantHNTB
|
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |