Project Description
This project consists of site work, excavation, installation, backfilling and testing of approximately 44,230 LF of 78" water transmission main; 40,640 LF of 8" foce main; 5,570 LF of 16" waterline; 44,230 LF of dual 4-1/2" fiber optic ducts; interconnections for future 72", 54" and 42" water mains, valves, blow-offs, concrete encsements, jacked casings, manholes, pavement, landscaping, corrosion protection system, connections to the Lake Pleasant Water Treatment Plant and the Tramonto water main, and miscellaneous appurtenances.
|
Contact
For similar projects contact:
Owner
Prime ConsultantStanley Consultants, Inc.
|
 |