www.pcl.com
HomeCareersWatch Us BuildLocationsContact Us

During Construction March 2007

Location:

Jacksonville, FL

Built By:

PCL Civil Constructors, Inc.
Project Description

The Mathews Bridge Deck Replacement Project involved the replacement of the 810'-0" channel span grating deck.  A new grating system was installed and concrete was placed within the grating.  The project included a 90-day shutdown.  For the most up-to-date information, please visit http://www.mathewsbridge.info/index.html .

 

 
Contact

Contact Project

Phone: (904) 357-8883
Fax: (904) 357-8887

Owner

Prime Consultant