Project Description
The Mathews Bridge Deck Replacement Project involved the replacement of the 810'-0" channel span grating deck. A new grating system was installed and concrete was placed within the grating. The project included a 90-day shutdown. For the most up-to-date information, please visit http://www.mathewsbridge.info/index.html .
|