| 1 2 3 |
Search Results |
 |
14th Street ICWW Bascule Bridge Rehab (Design/Build)
| Location: |
FL |
| Description: |
Structural Steel and Mechanical Rehabilitation |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Ben Sawyer Swing Bridge Design-Build
| Location: |
Charleston, SC |
| Description: |
Superstructure replacement of the Ben Sawyer Swing Bridge |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Central Link Light Rail C755
| Location: |
Tukwila, WA |
| Description: |
Light Rail and Station |
| Built By: |
PCL Construction Services, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Cross Bayou Bridge
| Location: |
FL |
| Description: |
Pedestrian/bicycle bridge
|
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Dania Beach Blvd Bascule Bridge Rehabilitation
| Location: |
Dania Beach, FL |
| Description: |
A Bascule Bridge Rehabilitation |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Dupont Bridge Design-Build Demolition
| Location: |
Panama City, FL |
| Description: |
Demolition of the Old Dupont Bridge remaining superstructure, substructure and approaches |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Eller Drive Loop Design-Build at US-1
| Location: |
Ft. Lauderdale, FL |
| Description: |
Design & Construct Eller Drive Ramp and Bridge |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Ernest F. Lyons High Level Design-Build Bridge Replacement
| Location: |
Stuart, FL |
| Description: |
Span by Span Segmental Bridge Construction |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Evans Crary Sr. Bridge Replacement
| Location: |
Stuart, FL |
| Description: |
Precast Segmental Bridge |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Flagler Beach Bridge Replacement
| Location: |
Flagler Beach, FL |
| Description: |
Cast-in-place Concrete Bridge |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Foothills Parkway Segmental Bridges
| Location: |
Walland, TN |
| Description: |
Cast-In-Place Segmental Bridges |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Fort Lauderdale Airport Design-Build Interchange
| Location: |
Dania Beach, FL |
| Description: |
Terminal Access Roadway Improvements |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Glade Creek Bridge
| Location: |
Beckley, Raleigh County, WV |
| Description: |
Four-lane Bridge |
| Built By: |
Westbrook Construction (1984-1990) |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Hart Bridge over St. Johns River on SR-228 (Bridge No. 720107)
| Location: |
Jacksonville, FL |
| Description: |
Structural Steel Repair and Bridge Painting |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Hillsboro Inlet Bascule Bridge Rehabilitation
| Location: |
FL |
| Description: |
Bascule Bridge Rehabilitation |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Hollywood Bascule Bridge Rehabilitation
| Location: |
Hollywood, FL |
| Description: |
Bascule Rehabilitation |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
I-275(SR-93) Himes Ave. to Hillsborough River
| Location: |
Tampa, FL |
| Description: |
Interstate Widening |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
I-4 Connector/Selmon Crosstown (from S. of Selmon Expressway to 7th Ave. N Bridge Abutment)
| Location: |
Tampa, FL |
| Description: |
I-4 and Lee Roy Selmon Expressway Connector |
| Built By: |
PCL / Archer Western, A Joint Venture |
| Delivery Method: |
[P3 (BIF)] P3 Build Interim Finance |
|
|
 |
I-4 Interchange @ SR-408 (East-West Expressway)
| Location: |
Orlando, FL |
| Description: |
Construct 7 bridges, widen 5 existing and roadwork. |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
I-4/St. Johns River Design-Build Bridge Replacement
| Location: |
Sanford, FL |
| Description: |
Twin Florida Bulb-Tee Girder Bridges |
| Built By: |
PCL Civil Constructors, Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
| |
| 1 2 3 |